Project Archives for Structural Roof Raising Services.
Spiniello Construction
LEARN MORE
Project Name : Spiniello Construction
Location : Morristown, NJ
Building Square Footage : 8,000
Roof Lifted : 8 feet
Added Cubic Feet : 64,000
Project Completion Date : 1978
M&A Machine
LEARN MORE
Project Name : M&A Machine
Location : Kearny, NJ
Building Square Footage : 5,000
Roof Lifted : 5 feet
Added Cubic Feet : 25,000
Project Completion Date : 1980
Syda Foundation
LEARN MORE
Project Name : Syda Foundation
Location : S. Fallsburg, NY
Building Square Footage : 15,000
Roof Lifted : 7 feet
Added Cubic Feet : 105,000
Project Completion Date : 1989
Peach Brothers
LEARN MORE
Project Name : Peach Brothers
Location : Roxbury, NJ
Building Square Footage : 2,000
Roof Lifted : 2 feet
Added Cubic Feet : 4,000
Project Completion Date : 1980
Vans Skatepark
LEARN MORE
Project Name : Vans Skatepark
Location : Moorestown, NJ
Building Square Footage : 18,000
Roof Lifted : 8 feet
Added Cubic Feet : 144,000
Project Completion Date : 1980
Airtron
LEARN MORE
Project Name : Airtron
Location : Morris Plains, NJ
Building Square Footage : 2,400
Roof Lifted : 5 feet
Added Cubic Feet : 12,000
Project Completion Date : 1981
Sanson and Son
LEARN MORE
Project Name : Sanson and Son
Location : Warminster, PA
Building Square Footage : 21,760
Roof Lifted : 12 feet
Added Cubic Feet : 261,120
Project Completion Date : 1982
Howmet
LEARN MORE
Project Name : Howmet
Location : Rockaway, NJ
Building Square Footage : 1,040
Roof Lifted : 11 feet
Added Cubic Feet : 11,440
Project Completion Date : 1984
Silverline Products
LEARN MORE
Project Name : Silverline Products
Location : Middlesex, NJ
Building Square Footage : 8,000
Roof Lifted : 12 feet
Added Cubic Feet : 96,000
Project Completion Date : 1984
Air Cargo
LEARN MORE
Project Name : Air Cargo
Location : Birmingham, Alabama
Building Square Footage : 24,000
Roof Lifted : 9 feet
Added Cubic Feet : 216,000
Project Completion Date : 1981
Carpet Warehouse
LEARN MORE
Project Name : Carpet Warehouse
Location : Albertson, NY
Building Square Footage : 26,000
Roof Lifted : 11 feet
Added Cubic Feet : 286,000
Project Completion Date : 1983
Port Authority
LEARN MORE
Project Name : Port Authority
Location : Elizabeth, NJ
Building Square Footage : 5,000
Roof Lifted : 2 feet
Added Cubic Feet : 10,000
Project Completion Date : 1981
Tifa LTD
LEARN MORE
Project Name : Tifa LTD
Location : Millington, NJ
Building Square Footage : 15,000
Roof Lifted : 10 feet
Added Cubic Feet : 150,000
Project Completion Date : 1985
Carpet Warehouse
LEARN MORE
Project Name : Carpet Warehouse
Location : Albertson, NY
Building Square Footage : 26,000
Roof Lifted : 11 feet
Added Cubic Feet : 286,000
Project Completion Date : 1983
Jersey City BLDG
LEARN MORE
Project Name : Jersey City BLDG
Location : Jersey City, NJ
Building Square Footage : 2,000
Roof Lifted : 4 feet
Added Cubic Feet : 8,000
Project Completion Date : 1985
Mack Warehouse
LEARN MORE
Project Name : Mack Warehouse
Location : Bridgewater, NJ
Building Square Footage : 365,742
Roof Lifted : 12 feet
Added Cubic Feet : 4,206,033
Project Completion Date : 1986
Van Leer
LEARN MORE
After raising the roof 13 feet, LiftEx installed new crane rails and crane systems in the building.
Project Name : Van Leer
Location : Warminster, PA
Building Square Footage : 8.500
Roof Lifted : 13 feet
Added Cubic Feet : 110,500
Project Completion Date : 1986
Krupp International
LEARN MORE
Project Name : Krupp International
Location : Edison, NJ
Building Square Footage : 4,000
Roof Lifted : 11 feet
Added Cubic Feet : 42,000
Project Completion Date : 1986
Chandeler Realty
LEARN MORE
Project Name : Chandeler Realty
Location : Bridgewater, NJ
Building Square Footage : 26,400
Roof Lifted : 6 feet
Added Cubic Feet : 158,400
Project Completion Date : 1989
Teleco Oilfield Service
LEARN MORE
Project Name : Teleco Oilfield Service
Location : Meriden CT
Building Square Footage : 5,184
Roof Lifted : 12 feet
Added Cubic Feet : 62,208
Project Completion Date : 1989
Sadek Imports
LEARN MORE
Project Name : Sadek Imports
Location : New Rochelle, NY
Building Square Footage : 55,000
Roof Lifted : 11 feet
Added Cubic Feet : 605,000
Project Completion Date : 1989
Auto Club of NY
LEARN MORE
Project Name : Auto Club of NY
Location : Garden City, NY
Building Square Footage : 38,612
Roof Lifted : 4 feet
Added Cubic Feet : 169,893
Project Completion Date : 1989
Continental Extrusion
LEARN MORE
Project Name : Continental Extrusion
Location : Cedar Grove, NJ
Building Square Footage : 9,800
Roof Lifted : 17 feet
Added Cubic Feet : 166,600
Project Completion Date : 1990
Axinn
LEARN MORE
Project Name : Axinn
Location : Melville, NY
Building Square Footage : 15,000
Roof Lifted : 10 feet
Added Cubic Feet : 150,000
Project Completion Date : 1990
Takasago
LEARN MORE
Project Name : Takasago
Location : Rockleigh, NJ
Building Square Footage : 4,500
Roof Lifted : 8 feet
Added Cubic Feet : 36,000
Project Completion Date : 1990
Rubies Costumes
LEARN MORE
Project Name : Rubies Costumes
Location : Melville, NY
Building Square Footage : 42,000
Roof Lifted : 13 feet
Added Cubic Feet : 558,600
Project Completion Date : 1991
Ben Elias Industries #1
LEARN MORE
Project Name : Ben Elias Industries #1
Location : Inwood, NY
Building Square Footage : 24,024
Roof Lifted : 21 feet
Added Cubic Feet : 510,510
Project Completion Date : 1990
Eagle Work Clothes
LEARN MORE
Project Name : Eagle Work Clothes
Location : Union, NJ
Building Square Footage : 10,296
Roof Lifted : 9 feet
Added Cubic Feet : 92,664
Project Completion Date : 1991
Interparts Inc.
LEARN MORE
Project Name : Interparts Inc.
Location : Plainview, NY
Building Square Footage : 20,007
Roof Lifted : 9 feet
Added Cubic Feet : 180,063
Project Completion Date : 1991
House of Spices
LEARN MORE
Project Name : House of Spices
Location : Flushing, NY
Building Square Footage : 1,800
Roof Lifted : 8 feet
Added Cubic Feet : 14,400
Project Completion Date : 1991
Bonnano Realty
LEARN MORE
Project Name : Bonnano Realty
Location : Ridgefield Park, NJ
Building Square Footage : 24,840
Roof Lifted : 10 feet
Added Cubic Feet : 248,400
Project Completion Date : 1992
Ben Elias Industries #2
LEARN MORE
Project Name : Ben Elias Industries #2
Location : Inwood, NY
Building Square Footage : 38,896
Roof Lifted : 21 feet
Added Cubic Feet : 816,816
Project Completion Date : 1992
Amscan
LEARN MORE
Project Name : Amscan
Location : Chester, NY
Building Square Footage : 168,320
Roof Lifted : 11 feet
Added Cubic Feet : 1,851,520
Project Completion Date : May 1993
Natures Bounty – Holbrook, NY
LEARN MORE
Project Name : Natures Bounty – Holbrook, NY (Building #1)
Location : Holbrook, NY
Building Square Footage : 95,124
Roof Lifted : 15 feet
Added Cubic Feet : 1,426,860
Project Completion Date : July 1993
Eber Brothers
LEARN MORE
Project Name : Eber Brothers
Location : New Rochelle, NY
Building Square Footage : 330,592
Roof Lifted : 7 feet
Added Cubic Feet : 400,372
Project Completion Date : Summer 1995
Haddon Craftsmen
LEARN MORE
Project Name : Haddon Craftsmen
Location : Dunmore, PA
Building Square Footage : 330,592
Roof Lifted : 14 feet
Added Cubic Feet : 4,628,288
Project Completion Date : November 1995
Linnens N Things
LEARN MORE
Project Name : Linnens N Things
Location : Novi, MI
Building Square Footage : 42,451
Roof Lifted : 5 feet
Added Cubic Feet : 212,255
Project Completion Date : November 1996
Interconnex
LEARN MORE
Project Name : Interconnex
Location : Elmsford, NY
Building Square Footage : 51,092
Roof Lifted : 11 feet
Added Cubic Feet : 562,012
Project Completion Date : July 1997
Frank Greek
LEARN MORE
Project Name : Frank Greek
Location : East Brunswick, NJ
Building Square Footage : 29,400
Roof Lifted : 7 feet
Added Cubic Feet : 205,800
Project Completion Date : October 1997
Scafani Brothers
LEARN MORE
Project Name : Scafani Brothers
Location : Norwalk, CT
Building Square Footage : 18,900
Roof Lifted : 14 feet
Added Cubic Feet : 113,640
Project Completion Date : June 1998
Speigle Associates
LEARN MORE
Project Name : Speigle Associates
Location : Westbury, NY
Building Square Footage : 9,470
Roof Lifted : 12 feet
Added Cubic Feet : 113,640
Project Completion Date : June 1998
Reliable Van And Storage
LEARN MORE
Project Name : Reliable Van And Storage
Location : Elizabeth, NJ
Building Square Footage : 15,275
Roof Lifted : 15 feet
Added Cubic Feet : 225,306
Project Completion Date : July 1998
Storage Quarters
LEARN MORE
Project Name : Storage Quarters
Location : Garden City, NY
Building Square Footage : 42,580
Roof Lifted : 11 feet
Added Cubic Feet : 455,606
Project Completion Date : July 1999
Champion Cutting Tool
LEARN MORE
Project Name : Champion Cutting Tool
Location : Rockville Center, NY
Building Square Footage : 6,240
Roof Lifted : 9 feet
Added Cubic Feet : 57,408
Project Completion Date : July 1999
Reckson Associates
LEARN MORE
Project Name : Reckson Associates
Location : Hicksville, NY
Building Square Footage : 153,644
Roof Lifted : 11 feet
Added Cubic Feet : 1,690,084
Project Completion Date : May 1996
Cove For Slide
LEARN MORE
Project Name : Cove For Slide
Location : Freeport, NY
Building Square Footage : 40,080
Roof Lifted : 11 feet
Added Cubic Feet : 440,880
Project Completion Date : June 1997
W & W Manufacturing
LEARN MORE
Project Name : W & W Manufacturing
Location : Hicksville, NY
Building Square Footage : 5,835
Roof Lifted : 11 feet
Added Cubic Feet : 61,268
Project Completion Date : May 2000
S.F Bristol
LEARN MORE
Project Name : S.F Bristol
Location : Bristol, CT
Building Square Footage : 100,000
Roof Lifted : 12 feet
Added Cubic Feet : 1,200,000
F.D. Holdings
LEARN MORE
Project Name : F.D. Holdings
Location : Long Island City, NY
Building Square Footage : 154,285
Roof Lifted : 13 feet
Added Cubic Feet : 2,005,705
Project Completion Date : January 2000
4 B’s III
LEARN MORE
Project Name : 4 B’s III
Location : Syosset, NY
Building Square Footage : 155,341
Roof Lifted : 9 feet
Added Cubic Feet : 1,398,069
Project Completion Date : July 2001
Back To Bristol
LEARN MORE
Project Name : Back To Bristol
Location : Bristol, CT
Building Square Footage : 167,018
Roof Lifted : 12 feet
Added Cubic Feet : 2,004,216
Project Completion Date : Spring 2000
Duralee Fabrics
LEARN MORE
Project Name : Duralee Fabrics
Location : Sayshore, NY
Building Square Footage : 65,790
Roof Lifted : 12 feet
Added Cubic Feet : 789,480
Project Completion Date : January 2000
Colony Supply
LEARN MORE
Project Name : Colony Supply
Location : New Haven, CT
Building Square Footage : 12,695
Roof Lifted : 9 feet
Added Cubic Feet : 114,255
Project Completion Date : February 2001
BFS
LEARN MORE
Project Name : BFS
Location : Bethpage, NY
Building Square Footage : 34,977
Roof Lifted : 11 feet
Added Cubic Feet : 384,747
Project Completion Date : March 2001
Best Buy
LEARN MORE
Project Name : Best Buy
Location : Manalapan, NJ
Building Square Footage : 49,880
Roof Lifted : 9 feet
Added Cubic Feet : 448,920
Project Completion Date : May 2001
Great Neck HS Gym
LEARN MORE
Project Name : Great Neck HS Gym
Location : Great Neck, NY
Building Square Footage : 6,016
Roof Lifted : 1 foot
Added Cubic Feet : 6,016
Project Completion Date : July 2001
Community Self Storage
LEARN MORE
Project Name : Community Self Storage
Location : Lindenhurst, NY
Building Square Footage : 22,946
Roof Lifted : 5 feet
Added Cubic Feet : 114,730
Project Completion Date : October 2001
Free Family
LEARN MORE
Project Name : Free Family
Location : Old Bethpage, NY
Building Square Footage : 39,941
Roof Lifted : 8 feet
Added Cubic Feet : 319,528
Project Completion Date : April 2002
Restaurant Depot – Cranston, RI
LEARN MORE
Project Name : Restaurant Depot – Cranston, RI
Location : Cranston, RI
Building Square Footage : 53,948
Roof Lifted : 10 feet
Added Cubic Feet : 539,480
Project Completion Date : March 2003
Jet Group
LEARN MORE
Project Name : Jet Group
Location : Islandia, NY
Building Square Footage : 5,846
Roof Lifted : 6 feet
Added Cubic Feet : 35,076
Natures Bounty – Holbrook, NY
LEARN MORE
Project Name : Natures Bounty – Holbrook, NY (building #2)
Location : Holbrook, NY
Building Square Footage : 97,978
Roof Lifted : 12 feet
Added Cubic Feet : 1,175,736
Project Completion Date : January 2003
Nabisco / Forsgate
LEARN MORE
Project Name : Nabisco / Forsgate
Location : Teterboro, NJ
Building Square Footage : 59,302
Roof Lifted : 18 feet
Added Cubic Feet : 1,067,436
Project Completion Date : January 2002
Gemstar
LEARN MORE
Project Name : Gemstar
Location : Monsey, NY
Building Square Footage : 63,000
Roof Lifted : 12 feet
Added Cubic Feet : 756,000
Project Completion Date : June 2003
GMA Inc.
LEARN MORE
Project Name : GMA Inc
Location : Carlstadt, NJ
Building Square Footage : 110,707
Roof Lifted : 12 feet
Added Cubic Feet : 1,328,484
Project Completion Date : June 2004
Moski Realty Tech-Knit Wire
LEARN MORE
Project Name : Moski Realty Tech-Knit Wire
Location : Cranford, NJ
Building Square Footage : 29,978
Roof Lifted : 10 feet
Added Cubic Feet : 299,780
Project Completion Date : June 2004
Hanse Realty
LEARN MORE
Project Name : Hanse Realty
Location : Freeport, NY
Building Square Footage : 10,520
Roof Lifted : 11 feet
Added Cubic Feet : 115,720
Project Completion Date : July 2005
Grand Machinery
LEARN MORE
Project Name : Grand Machinery
Location : Hauppauge, NY
Building Square Footage : 20,414
Roof Lifted : 15 feet
Added Cubic Feet : 306,210
Project Completion Date : November 2005
High Point Manufacturing
LEARN MORE
Project Name : High Point Manufacturing
Location : Chalfont, PA
Building Square Footage : 25,032
Pre Lift Roof Height : 300,384
Roof Lifted : 12 feet
Added Cubic Feet : 300,384
Project Completion Date : January 2006
Restaurant Depot – Garden City, NY
LEARN MORE
Project Name : Restaurant Depot – Garden City, NY
Location : Garden City, NY
Building Square Footage : 58,581
Roof Lifted : 10 feet
Added Cubic Feet : 585,810
Project Completion Date : March 2006
Ramada Inn
LEARN MORE
Project Name : Ramada Inn
Location : Wayne, NJ
Building Square Footage : 11,610
Roof Lifted : 5 feet
Added Cubic Feet : 58,050
Project Completion Date : October 2006
JLJIV
LEARN MORE
Project Name : JLJIV
Location : Brooklyn, NY
Building Square Footage : 13,790
Roof Lifted : 9 feet
Added Cubic Feet : 124,110
Project Completion Date : April 2006
WE 75
LEARN MORE
Project Name : WE 75
Location : Hartford, CT
Building Square Footage : 43,814
Roof Lifted : 10 feet
Added Cubic Feet : 438,140
Project Completion Date : March 2006
Manhattan Laminates
LEARN MORE
Project Name : Manhattan Laminates
Building Square Footage : 21,830
Roof Lifted : 12 feet
Added Cubic Feet : 261,960
Project Completion Date : September 2006
Detroit Diesel
LEARN MORE
Project Name : Detroit Diesel
Location : Detroit, MI
Building Square Footage : 115,200
Roof Lifted : 12 feet
Added Cubic Feet : 1,382,400
Project Completion Date : August 2006
Wells Manufacturing
LEARN MORE
Project Name : Wells Manufacturing
Location : Woodstock, Ill
Building Square Footage : 24,000
Roof Lifted : 7 feet
Added Cubic Feet : 168,000
Project Completion Date : March 2007
Dow Chemical
LEARN MORE
Project Name : Dow Chemical
Building Square Footage : 6,400
Roof Lifted : 11 feet
Added Cubic Feet : 70,400
Project Completion Date : October 2006
Register Lithographers
LEARN MORE
Project Name : Register Lithographers
Location : Clifton, NJ
Building Square Footage : 9,706
Roof Lifted : 9 feet
Added Cubic Feet : 87,354
Project Completion Date : May 2007
Cancos Tile
LEARN MORE
Project Name : Cancos Tile
Location : Hicksville, NY
Building Square Footage : 24,838
Roof Lifted : 19 feet
Added Cubic Feet : 471,922
Project Completion Date : December 2006
Tell Reality
LEARN MORE
Project Name : Tell Reality
Location : Farmingdale, NY
Building Square Footage : 66,209
Roof Lifted : 21 feet
Added Cubic Feet : 1,390,389
Circuit City
LEARN MORE
Project Name : Circuit City
Location : North Plainfield, NJ
Building Square Footage : 31,200
Roof Lifted : 5 feet
Added Cubic Feet : 156,000
Project Completion Date : December 2007
Petsmart
LEARN MORE
Project Name : Petsmart
Location : Howell, NJ
Building Square Footage : 19,700
Sherland and Farrington
LEARN MORE
Project Name : Sherland and Farrington
Location : Brooklyn, NY
Building Square Footage : 10,454
Pre Lift Roof Height : 23 feet
Added Cubic Feet : 240,442
Moore / Forsgate
LEARN MORE
This was our third project for repeat customer Forsgate Industries / Herrod Construction. After the success of the other two projects, they lifted this building from 27 feet to 40 feet. This project was featured in new York Real Estate Journal. View the article here
Project Name : Moore / Forsgate
Location : Cranbury, NJ
Building Square Footage : 220,704
Pre Lift Roof Height : 27
Post Lift Roof Height : 40
Roof Lifted : 13 feet
Added Cubic Feet : 2,869,152
Mandees
LEARN MORE
Project Name : Mandees
Location : Clifton, NJ
Building Square Footage : 11,821
Roof Lifted : 11 feet
Added Cubic Feet : 118,210
Project Completion Date : May 2008
International Delights
LEARN MORE
Project Name : International Delights
Location : Clifton, NJ
Building Square Footage : 128,000
Roof Lifted : 9 feet
Added Cubic Feet : 1,152,000
Project Completion Date : March 2008
Hyundai – Forsgate
LEARN MORE
This was the second project for repeat customer Forsgate / Herrod Construction. This building was a 300,000 SF warehouse in South Brunswick, NJ and was also a very well located building. In this case adjacent to Exit 8A with visibility from the Turnpike. The building had been built in 1990 and had a clear height of 26’ which was typical for the market at that time. Since that time however warehouse technology has evolved to where it is feasible to store much higher than in traditional facilities. New buildings in this market are being built to 40’ clear height. In 2009 in order to keep our building competitive with these newer ones we made the decision to raise it. LIFTEX performed the lift in halves, split at the expansion joint. The lift was 15’-3” (from 28’-8” at the perimeter wall to 43’-11”). This building has since been leased to a company that “fills the cube” with a high rack system throughout the warehouse.
Project Name : Hyundai – Forsgate
Location : South Brunswick, New Jersey
Building Square Footage : 303,160
Pre Lift Roof Height : 28’8″
Post Lift Roof Height : 43’11”
Roof Lifted : 15’3″
Added Cubic Feet : 4,244,240
Project Completion Date : 2010
AGFA KILN
LEARN MORE
Project Name : AGFA KILN
Location : Somerville, NJ
Building Square Footage : 1,500
Roof Lifted : 6 feet
Added Cubic Feet : 9,000
Project Completion Date : January 2010
HOM Furniture
LEARN MORE
Project Name : HOM Furniture
Location : Sioux Falls, South Dakota
Building Square Footage : 34,923
Roof Lifted : 11 feet
Added Cubic Feet : 384,153
Project Completion Date : September 2010
Haddad
LEARN MORE
Project Name : Haddad
Location : South Brunswick, NJ
Building Square Footage : 97,580
Pre Lift Roof Height : 24 feet
Post Lift Roof Height : 43 feet
Roof Lifted : 19 feet
Added Cubic Feet : 1,854,020
Project Completion Date : February 2012
Restaurant Depot – Neptune, NJ
LEARN MORE
Project Name : Restaurant Depot – Neptune, NJ
Location : Neptune, NJ
Building Square Footage : 51,457
Roof Lifted : 10
Added Cubic Feet : 514,570
Project Completion Date : July 2011
Natures Bounty – Amityville, NY
LEARN MORE
Project Name : Natures Bounty – Amityville, NY
Location : Amityville, NY
Building Square Footage : 34,946
Roof Lifted : 12 feet
Added Cubic Feet : 419,352
Project Completion Date : June 2011
Rentar Development
LEARN MORE
Project Name : Rentar Development
Location : Brooklyn, NY
Building Square Footage : 2,757
Roof Lifted : 5 feet
Added Cubic Feet : 13,785
Project Completion Date : April 2012
Eaton Corp
LEARN MORE
Project Name : Eaton Corp
Location : Mountainside, NJ
Building Square Footage : 5,346
Roof Lifted : 6 feet
Added Cubic Feet : 32,076
Kontos Foods
LEARN MORE
Project Name : Kontos Foods
Location : Paterson, NJ
Building Square Footage : 17,962
Pre Lift Roof Height : 12 Feet
Post Lift Roof Height : 29.5 Feet
Roof Lifted : 17.5 feet
Added Cubic Feet : 314,335
Project Completion Date : January 2012
Peyser Sportswear
LEARN MORE
Project Name : Peyser Sportswear
Location : Bayshore, Long Island, NY
Building Square Footage : 55,281 feet
Pre Lift Roof Height : 16 feet
Post Lift Roof Height : 39 feet
Roof Lifted : 23 feet
Added Cubic Feet : 1,271,463
Bayport Partners
LEARN MORE
Project Name : Bayport Partners
Location : Bayport, Long Island, NY
Building Square Footage : 175,650
Roof Lifted : 22 feet
Added Cubic Feet : 3,864,300
Project Completion Date : July 2009
Restaurant Depot – Richmond, VA
LEARN MORE
Project Name : Restaurant Depot
Location : Richmond, VA
Building Square Footage : 51,457
Pre Lift Roof Height : 18.5 Feet
Post Lift Roof Height : 32.5 Feet
Roof Lifted : 14 Feet
Added Cubic Feet : 720,398
Project Completion Date : May 2012
Orefield Cold Storage
LEARN MORE
Project Name : Orefield Cold Storage
Location : Allentown, PA
Building Square Footage : 97,580
Pre Lift Roof Height : 16 Feet
Post Lift Roof Height : 29 Feet
Roof Lifted : 13 Feet
Added Cubic Feet : 1,268,540
Project Completion Date : July 2012
Townsend Farms
LEARN MORE
Project Name : Townsend Farms
Location : Vineland, NJ
Building Square Footage : 59,096
Pre Lift Roof Height : 13.5 Feet
Post Lift Roof Height : 24 Feet
Roof Lifted : 10.5 Feet
Added Cubic Feet : 620,508
Project Completion Date : September 2012
Arrow Linen
LEARN MORE
Project Name : Arrow Linen
Location : Garden City, NY
Building Square Footage : 46,971
Pre Lift Roof Height : 14 Feet
Post Lift Roof Height : 25 Feet
Roof Lifted : 11 Feet
Added Cubic Feet : 516,681
Safe Art
LEARN MORE
This client is in the business of storing Works of Art. This building is located in a centralized location, and offered the desired square feet, but was vertically challenged.
Project Name : Safe Art
Location : Mt. Vernon, NY
Building Square Footage : 44,630
Pre Lift Roof Height : 11.5 Feet
Post Lift Roof Height : 19.5 Feet
Roof Lifted : 8 Feet
Added Cubic Feet : 357,040
Sandvick
LEARN MORE
Sandvick Corporation was looking to stay in it’s existing location, but needed more space for offices. This required six more feet of clear height to accommodate second floor office space.
Project Name : Sandvick
Location : Fair Lawn, NJ
Building Square Footage : 33,600
Pre Lift Roof Height : 19 Feet
Post Lift Roof Height : 25 Feet
Roof Lifted : 6 Feet
Added Cubic Feet : 201,600
Gallina
LEARN MORE
This client found this building with the clear span bays to accommodate two indoor turf fields, but was lacking in clear height. They required the building to be lifted 11 feet to meet their needs.
Project Name : Gallina
Location : Rochester, NY
Building Square Footage : 35,000
Pre Lift Roof Height : 12.5 Feet
Post Lift Roof Height : 23.5 Feet
Roof Lifted : 11 Feet
Added Cubic Feet : 385,000
John F. Martin and Sons
LEARN MORE
JF Martin was looking for a building to accommodate its growing meat processing business. This building met all their requirements except it was not high enough for their needs. LIFTEX had the solution. The project was completed in October 2013 and they are now in full operation with all the space they need. This project was also featured in the Reading Eagle. View the article here. John F Martin Website – www.johnfmartinmeats.com/
Project Name : John F. Martin and Sons
Location : Womelsdorf, PA
Building Square Footage : 123,000 square feet
Pre Lift Roof Height : 13′-6″ (two areas)
Post Lift Roof Height : Area 1 lifted to 30′-0 Area 2 lifted to 21′-0
Roof Lifted : Area 1: 17′-6 Area 2: 7′-6
Added Cubic Feet : 1,492,365 — nearly 1.5 million cubic feet!
Project Completion Date : October 2013
Best Foods
LEARN MORE
This food supply company needed more height for storing restaurant supplies.
Project Name : Best Foods27,000
Location : Springfield, VA
Building Square Footage : 27,000
Pre Lift Roof Height : 14 feet
Post Lift Roof Height : 22 feet
Roof Lifted : 8 feet
Added Cubic Feet : 216,000
U-Haul
LEARN MORE
U-Haul hired LIFTEX to lift this small existing building
Project Name : U-Haul
Location : Englishtown, NJ
Building Square Footage : 5,032
Pre Lift Roof Height : 12 foot
Hartz Mountain
LEARN MORE
When Panasonic Industries relocated from its Secaucus, NJ location to Newark, NJ, Hartz Mountain needed to keep this property competitive in the warehousing market. The client is raising the roof on spec and has already leased the space prior to completion of the project. LIFTEX is also handling all of Hartz Mountains structural steel needs during this renovation. Ferguson Plumbing now occupies this space. Ferguson Plumbing website – https://www.ferguson.com/
Project Name : Hartz Mountain – 650,000 square feet raised 8′-0
Location : Secaucus, NJ
Building Square Footage : 650,000
Pre Lift Roof Height : 24 feet
Post Lift Roof Height : 32 feet
Roof Lifted : 8 feet
Added Cubic Feet : 5,200,000
GRM
LEARN MORE
Client needed more cube for storage of documents. They opted to raise the roof 21 feet to expand their business. This lift was phased into 5 lifting areas. This project was featured in Modern Steel Construction in August of 2014. View the article here. GRM Website – www.grmdocumentmanagement.com/
Project Name : GRM– 430,000 square feet being raised 21 feet!
Location : Jamesburg, NJ
Building Square Footage : 430,000
Pre Lift Roof Height : 24 Feet
Post Lift Roof Height : 45 Feet
Roof Lifted : 21 feet
Added Cubic Feet : 9,030,000
Gabrielli Truck Sales
LEARN MORE
Project Name : Gabrielli Truck Sales
Location : Hicksville, NY
Building Square Footage : 58,080 sq ft
Pre Lift Roof Height : 14 ft
Post Lift Roof Height : 26 ft
Roof Lifted : 12 ft
Added Cubic Feet : 696,960
Project Completion Date : Fall 2016
Lifted two adjacent buildings and infilled alley to create one large building: https://youtu.be/bRIDL8XSR0E
JMD
LEARN MORE
Project Name : JMD
Location : Piscataway, NJ
Building Square Footage : 49,410 sq ft
Pre Lift Roof Height : 19 ft
Post Lift Roof Height : 30 ft
Roof Lifted : 11 ft
Added Cubic Feet : 543,510
Project Completion Date : Winter 2016
Lifted for a customer for re-packaging and product distribution: https://youtu.be/5hWCDwPa3uE
H-Mart
LEARN MORE
This former furniture warehouse will now become H-Marts new office and distribution center. The facility will also include a cold storage area, and a new three story mezzanine for offices. LIFTEX installed new perimeter steel to transform a wall bearing structure to steel bearing: https://youtu.be/mnaarhOVap4
Project Name : H-Mart
Location : Carlstadt, NJ
Building Square Footage : 77,544
Pre Lift Roof Height : 20’3″
Post Lift Roof Height : 36’3″
Roof Lifted : 16’0″
Added Cubic Feet : 1,240,704
Project Completion Date : Winter 2016
Great Oaks Charter School
LEARN MORE
Roof is being lifted to repurpose a multipurpose room as the schools new basketball court. This building is a wood bow truss building dating back to the early 1900’s, it is the first of its kind to be lifted. Team LiftEx is excited to take on this difficult challenge: https://youtu.be/f9Nk1Ok7paU
Project Name : Great Oaks Charter School
Location : Newark, NJ
Building Square Footage : 7500
Pre Lift Roof Height : 12
Post Lift Roof Height : 20′-6″
Roof Lifted : 8′-6″
Added Cubic Feet : 63750
Project Completion Date : Early 2017
Mauser USA LLC
LEARN MORE
Current Plastics forming facility that requires more height for new machinery. Our highly experienced team was able to lift two bays of the building, install and weld all re-support steel, install the new siding enclosure, and reseal the roof for a watertight shell in less than three days. This minimized the time that the occupied facility was exposed to the elements: https://youtu.be/D1sm18GDVqA
Project Name : Mauser USA LLC
Location : East Brunswick, NJ
Building Square Footage : 2400
Pre Lift Roof Height : 20 Ft.
Post Lift Roof Height : 30 Ft.
Roof Lifted : 10 Ft.
Added Cubic Feet : 24000
Project Completion Date : Spring 2017
Paramount
LEARN MORE
Paramount Facility Management purchased this vacant building to act as a new office and warehouse facility. LIFTEX will be lifting the rear section of the building to allow for higher storage in the warehouse area: https://youtu.be/iHqw4vw459c
Project Name : Paramount
Location : Branchburg, NJ
Building Square Footage : 8500
Pre Lift Roof Height : 10 ft
Post Lift Roof Height : 20 ft
Roof Lifted : 10 ft
Added Cubic Feet : 85000
Project Completion Date : Summer 2017
Cadillac Products
LEARN MORE
Former Cadillac Products manufacturing facility is being renovated to create a modern usable space for future tenants. The LIFTEX team is working in conjunction with Roncelli General Contractors: https://youtu.be/F_5HN7M4Dts
Project Name : Cadillac Products
Location : Sterling Heights, Michigan
Building Square Footage : 72,800
Pre Lift Roof Height : 14
Post Lift Roof Height : 20
Roof Lifted : 6
Added Cubic Feet : 436800
Project Completion Date : https://www.youtube.com/watch?v=20LW8QQThs4
Innovive
LEARN MORE
Former Vacant mixed manufacturing building is being lifted and converted into warehouse and office space for the new owner: https://youtu.be/cq7s-UElDNE
Project Name : Innovive
Location : Billerica, Mass.
Building Square Footage : 28,375
Pre Lift Roof Height : 18′-8″
Post Lift Roof Height : 31′-6″
Roof Lifted : 12′-10″
Added Cubic Feet : 364,000
Project Completion Date : Fall 2017
Sacks Exhibits
LEARN MORE
This former Pfizer building is now home to Sacks Exhibits. Sacks is a set and display builder. Sacks Exhibits website – www.sacksexhibits.com
Project Name : Sacks Exhibits
Location : Lowell, Mass.
Building Square Footage : 57,600
Pre Lift Roof Height : 14 feet
Post Lift Roof Height : 25 feet
Roof Lifted : 11 feet
Added Cubic Feet : 633,600 cubic feet
Project Completion Date : June 2015
Millions – Golden Fortune
LEARN MORE
This Chinese food distributor relocated to Bayonne after eminent domain forced them to relocate. This lift was done while the building was occupied. This project also features and external snow deck on an un-lifted lower portion of the building. Golden Fortune Website – www.goldenfortuneusa.com
Project Name : Millions – Golden Fortune
Location : Bayonne NJ
Building Square Footage : 224,000
Pre Lift Roof Height : 19’0″
Post Lift Roof Height : 29’0″
Roof Lifted : 10 feet
Added Cubic Feet : 2,240,000
Skyzone
LEARN MORE
Skyzone, a trampoline facility, needed 5 extra feet to accommodate its needs in an existing building. The building owner was going to lower the floor of this ex-Staples building 5 feet in order to fit the trampolines in the building. The costs associated with this made the project very difficult. LIFTEX was consulted by the owner and GC to see if the building could be raised 5 feet. The costs associated with raising the roof was within budget, and Skyzone will now occupy this building upon completion of renovations. This project was featured in the Daily Record on August 19, 2015. you can view the article by clicking here. This project was featured in the Mt. Olive Chronicle on August 27, 2015, you can view the article by clicking here. This Project was featured in the Mt. Olive News. You can view the article by clicking here and going to page #30. Skyzone website – www.skyzone.com/mountolive/
Project Name : Skyzone
Location : Mt Olive, NJ
Building Square Footage : 22,000
Pre Lift Roof Height : 13’6″
Post Lift Roof Height : 18’6″
Roof Lifted : 5 feet
Project Completion Date : August 2015
Self Storage Depot
LEARN MORE
This former self storage building was purchased by Reliance Marble. Reliance Marble plans to locate their office and warehouse in the new facility. LIFTEX will also be supplying new steel for all the over head doors on this project.
Project Name : Self Storage Depot
Location : Kenilworth NJ
Building Square Footage : 41,230
Pre Lift Roof Height : 14’9″
Post Lift Roof Height : 21’9″
Roof Lifted : 7’0
Added Cubic Feet : 288,610
Old Navy
LEARN MORE
Former Old Navy store located in a strip mall was raised to allow for a new mezzanine for a two story retail space. Maintained wall bearing roof by extending the wall with a metal stud system: https://youtu.be/LrTTeC9hAnw
Project Name : Old Navy
Location : Bronx, NY
Building Square Footage : 22,200 sq ft
Pre Lift Roof Height : 16 ft
Post Lift Roof Height : 31 ft
Roof Lifted : 15 ft
Added Cubic Feet : 330,000
Execuspace – Shelton CT
LEARN MORE
This former Sikorsky building was bought by a developer and is being lifted for his new tenants requirements. This building sat vacant for almost 10 years before hiring LIFTEX to lift the roof. This owner also owns the Toshiba warehouse.
Project Name : Execuspace – Shelton CT
Location : Shelton, CT
Building Square Footage : 45,904
Pre Lift Roof Height : 12’5″
Post Lift Roof Height : 22’5″
Roof Lifted : 10’0″
Added Cubic Feet : 459,040
50 Railroad Ave
LEARN MORE
This houseware company purchased this building to expand his business. LIFTEX was also hired to install a 50′ x 140′ mezzanine within the building to house their offices. The roof was lifted January 6, 2016.
Project Name : 50 Railroad Ave
Location : Closter, NJ
Building Square Footage : 39,690
Pre Lift Roof Height : 13’9″
Post Lift Roof Height : 22’7″
Roof Lifted : 8’10”
Added Cubic Feet : 350,463
Kleen Rite Corp.
LEARN MORE
Former Donnegal Industries sewing factory is being re purposed as a wharehouse and distribution center for Kleen Rite car wash products. This building was a multiple phase lift comprising of 5 different sections with three different roof heights.
Project Name : Kleen Rite Corp.
Location : Mt. Joy, PA
Building Square Footage : 95,451 sq ft
Pre Lift Roof Height : 9′-10″ to 16′-2″
Post Lift Roof Height : 25′-10″ to 27′-8″
Roof Lifted : 9′-8″ to 16′-4″
Added Cubic Feet : 1,384,405
Project Completion Date : Summer 2016
Toshiba
LEARN MORE
This former Toshiba distribution center has sat vacant for 15+ years. Its location, sitting directly on Route 287 north, was prime. However, the 18’0 headroom was just not sufficient in today’s market. The client is a repeat customer and is also lifting another building in Connecticut.
Project Name : Toshiba
Location : Parsippany, NJ
Building Square Footage : 48,000
Pre Lift Roof Height : 18’0
Post Lift Roof Height : 24’8″
Roof Lifted : 6’8″
Added Cubic Feet : 319,580
Walgreens
LEARN MORE
LIFTEX Raised the Roof on an existing strip mall space so that roof heights could be leveled.
Project Name : Walgreens
Location : Staten Island, NY
Building Square Footage : 9200
Pre Lift Roof Height : 13 ft
Post Lift Roof Height : 15 ft
Roof Lifted : 2 ft
Added Cubic Feet : 18,240
Restaurant Depot, NJ
LEARN MORE
Repeat customer, Restaurant Depot, purchased this building with the intent to raise the roof in order to relocate to a larger building that meets their growing needs. LIFTEX crews began work on March 10, 2014 and raised the roof on April 9, 2014, less than five weeks from the day our crews started working on the building. New siding will be added next and the building will be turned over for occupancy. We have also been contracted to do the entire structural steel and miscellaneous steel package on this project. This includes 4 exterior stairs, new roof access ladders, new HVAC support steel, bar joist reinforcing, a small addition to the front of the building, overhead door frames, new dock leveler angles, steel lintels, and many other miscellaneous steel items throughout the building. Restaurant Depot Website – http://www.restaurantdepot.com/
Project Name : Restaurant Depot – South Plainfield, NJ
Location : South Plainfield, NJ
Building Square Footage : 101,200
Pre Lift Roof Height : 22 Feet
Post Lift Roof Height : 32 Feet
Roof Lifted : 10 Feet
Added Cubic Feet : 1,012,000
GET A QUOTE.
For a quick estimate, fill out and submit the quote form. While a firm quote requires a site survey, we’ll provide an indicative figure. Attach documents, drawings, or images to the lead form for better assessment. Thank you!