Roof Lifting System & Safety Protocols

Meet LIFTEX, formerly E-Z Riser Roof Raising.

At LIFTEX, safety is our top priority for all lifting operations. Before any roof lifting project commences, we ensure comprehensive safety protocols are in place:

Employee Training:

All new hires undergo 10 to 30 hours of OSHA training, which includes but is not limited to:

Read More
  • Personal Protective Equipment (PPE) training: We prioritize the use of appropriate PPE for every employee involved in our projects.
  • Equipment Operation: written and practical exams are mandatory before stepping on-site for scissor lifts, forklifts, and articulating (boom) lifts.
  • Toolbox Talks: Regular safety meetings keep our team informed about potential hazards and safety requirements unique to each jobsite.
  • Employee Vigilance: Every team member is empowered to identify and report potential hazards.
  • Immediate Communication: Walkie-talkies are a common tool used to facilitate immediate communication among all team members.
  • Weather Considerations: Our team is trained to adapt on the fly and prioritize safety by rescheduling lifts in adverse weather conditions.
  • Regular Review and Updates: Training documents are regularly reviewed and updated to reflect the latest safety standards.
  • Quarterly Safety Meetings: Comprehensive safety meetings are held to reinforce safety protocols.
  • Job Box: Our job sites are equipped with essential safety gear and materials, ensuring preparedness for any situation.
  • Cease Fire Protocol: Operations halt immediately in the event of an incident until the scene is deemed safe to continue.
LIFTEX Commercial Roof Lift Projects
LIFTEX Commercial Roof Lift Projects

In addition, our lifting equipment is designed with built-in safety redundancies:

 LIFTEX, safety isn’t just a priority; it’s a commitment. From comprehensive training to stringent protocols and ongoing maintenance, we ensure that every aspect of our operations prioritizes the safety of our team and stakeholders.

Read More
  • Individual Cylinder Control: Unlike centralized systems, each lift point is equipped with its own cylinder control, preventing a complete system failure by creating many less significant points of failure rather than a single catastrophic one.
  • Double-Valve System Operation: Our lifting mechanisms are equipped with a double-valve system, providing an additional layer of protection against lift failure.
  • Double Pin Lifting system: Our lift points use a hardened lifting pin, rated to sustain the lift point load, plus a secondary safety pin of equal rating at each point.
  • Equipment Maintenance: Our lifting equipment pumps undergo regular inspection, cleaning, and servicing to maintain optimal performance and safety standards.
  • On the site, Erection Cabling is installed the same day we lift the roof, in accordance with a PE approved design.
  • We also ensure compliance with local, state, and federal safety regulations by following OSHA guidelines.

GET A QUOTE.

For a quick estimate, fill out and submit the quote form. While a firm quote requires a site survey, we’ll provide an indicative figure. Attach documents, drawings, or images to the lead form for better assessment. Thank you!